Anzac Rifle Range, Malabar

Anzac Rifle Range, Malabar

The Anzac Rifle Range project involved the removal of existing electrical infrastructure and installation of new power and lighting systems along the rear of a new retaining wall.

Scope of works included:

  • Isolation and demolition of existing cabling and fittings
  • Installation of lockable GPOs along the retaining wall
  • Supply and installation of one stainless-steel distribution board
  • New submains back to an existing MSB on site approx.. 200m away
  • Provision of 11 vandal-proof light fittings with photoelectric cell control for automatic operation
  • All cabling installed in PVC conduit with stainless-steel saddles, including hand excavation for underground sections
  • Testing, and commissioning of all new infrastructure

The installation provided a durable, compliant, and low-maintenance electrical system designed to withstand the coastal environment.