The Anzac Rifle Range project involved the removal of existing electrical infrastructure and installation of new power and lighting systems along the rear of a new retaining wall.
Scope of works included:
- Isolation and demolition of existing cabling and fittings
- Installation of lockable GPOs along the retaining wall
- Supply and installation of one stainless-steel distribution board
- New submains back to an existing MSB on site approx.. 200m away
- Provision of 11 vandal-proof light fittings with photoelectric cell control for automatic operation
- All cabling installed in PVC conduit with stainless-steel saddles, including hand excavation for underground sections
- Testing, and commissioning of all new infrastructure
The installation provided a durable, compliant, and low-maintenance electrical system designed to withstand the coastal environment.
