Zammit Smallgoods – Fire Rebuild Stage 1

On Top were engaged to provide a major overhaul to existing infrastructure. This project was 100% design & construct by On Top, including providing new:

  • We provided the electrical and communications for the design and construct package.
  • We engaged Shelmerdine Electrical Consultants to complete the design portion of our works and to provide advice in relation to the existing site substation and LV MSB.
  • We provided Lighting, Power, Outlets, Submains, Distribution Boards.
  • Both the head contractor and end user are long time clients of ours.