On Top were selected to provide a total rewire and major design and construct reconfiguration of the 1950’s Zammit Smallgoods facility at Pendle hill with Wiley & Co,
Our scope included:
- New pad mounted substation LV MSB 1500amp
- New external PFC + Active Harmonic Filtering unit
- Three new 630amp main distribution boards
- Seven new 250amp distribution boards
- New cable trays, submain cabling to above mentioned boards
- New sub-circuit cabling
- New HACCP lighting, power, and stainless-steel conduits
We engaged Shelmerdine Electrical Consultants to complete the design portion of our works.