On Top were engaged to provide a major overhaul to existing infrastructure. This project was 100% design & construct by On Top, including providing new:
- Site MSB 800 amp rated
- 800 amp consumer mains
- Motor Control Centre
- Site distribution boards
- External rated stainless steel distribution boards
- New submains
- Underground pits, conduits including hydro excavation
- Motor connections and control stations
- Run / stop indicator lights
- Emergency stop system
- Float switches
- 250amp submains and plant distribution board